Power Grid AC & Equipment Logs

The first form is a daily log sheet for the central air conditioning plant, where technicians record readings every 8 hours for equipment like compressors and pumps, as well as gas pressures, temperatures, and electrical power supply details. The second form is a monthly record of running hours for compressor/pump equipment, where date and daily meter readings are logged to track equipment usage over the month. The third form is an LT (low tension) supply outage register to record details of any power disruptions like date, time, duration and cause for analysis.

Uploaded by

ramesh epili
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views3 pages

Power Grid AC & Equipment Logs

The first form is a daily log sheet for the central air conditioning plant, where technicians record readings every 8 hours for equipment like compressors and pumps, as well as gas pressures, temperatures, and electrical power supply details. The second form is a monthly record of running hours for compressor/pump equipment, where date and daily meter readings are logged to track equipment usage over the month. The third form is an LT (low tension) supply outage register to record details of any power disruptions like date, time, duration and cause for analysis.

Uploaded by

ramesh epili
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Doc. No.

:D-3-13-XX-01-03

POWER GRID CORPORATION OF INDIA LTD

Form No: ABC 1XX

Region: Substation:

Daily Log Sheet for Central AC Plant

Date Month Year


Day

Time In service equipment Gas pressure in bar Condenser Water Hour meter reading Power supply
temp in oC
Comp Pump I/II AHU I/II HP LP OP Inlet Outlet Comp-I Comp-II V A
I/II
Hrs.
0800
1600
2300

Readings to be taken once in a shift Shift Tech./ JE Shift I/C


AC Plant failure Annunciation to be ensured in Control Room C
A
Note: Column spacing to be adjusted/ modified as per site requirement. B
C
Doc. No.:D-3-13-XX-01-03

POWER GRID CORPORATION OF INDIA LTD

Form No. ABC 2XX

Region……… Substation……………

Monthly Record of CB compressor/pump running hours

Month…………

CB No: CB No: CB No:


Date Hour Daily Hour Daily Hour Daily Signature
Meter Running Meter Running Meter Running
Reading Hours Reading Hours Reading Hours

01
02
03
04
.
.
.
.
.
.
.
.
.
29
30
31

Note: Readings to be taken daily at 1000 Hrs.


Doc. No.:D-3-13-XX-01-03

POWER GRID CORPORATION OF INDIA LTD

Form No. ABC 2XX

Region……… Substation……………

LT Supply outage register

Month…………

Sl.no Date Time Duration Cause of Signature


of LT of of outage outage
Fail restoratio
n
01
02
03
04

Cumulative outage Hours: