Doc. No.
:D-3-13-XX-01-03
POWER GRID CORPORATION OF INDIA LTD
Form No: ABC 1XX
Region: Substation:
Daily Log Sheet for Central AC Plant
Date Month Year
Day
Time In service equipment Gas pressure in bar Condenser Water Hour meter reading Power supply
temp in oC
Comp Pump I/II AHU I/II HP LP OP Inlet Outlet Comp-I Comp-II V A
I/II
Hrs.
0800
1600
2300
Readings to be taken once in a shift Shift Tech./ JE Shift I/C
AC Plant failure Annunciation to be ensured in Control Room C
A
Note: Column spacing to be adjusted/ modified as per site requirement. B
C
Doc. No.:D-3-13-XX-01-03
POWER GRID CORPORATION OF INDIA LTD
Form No. ABC 2XX
Region……… Substation……………
Monthly Record of CB compressor/pump running hours
Month…………
CB No: CB No: CB No:
Date Hour Daily Hour Daily Hour Daily Signature
Meter Running Meter Running Meter Running
Reading Hours Reading Hours Reading Hours
01
02
03
04
.
.
.
.
.
.
.
.
.
29
30
31
Note: Readings to be taken daily at 1000 Hrs.
Doc. No.:D-3-13-XX-01-03
POWER GRID CORPORATION OF INDIA LTD
Form No. ABC 2XX
Region……… Substation……………
LT Supply outage register
Month…………
Sl.no Date Time Duration Cause of Signature
of LT of of outage outage
Fail restoratio
n
01
02
03
04
Cumulative outage Hours: