Customer Contract
Location #
Project
Contractor
AREVA T&D Site test record RELAY TEST Doc. Ref.
MVTP11- CT SUPERVISION RELAY
1. GENERAL DATA AND INFORMATION:
Circuit. Model no:
Panel No. Aux. supply
Make: No of contacts
Frequency R phase Sl.no
Flag type Y phase Sl.no
Setting Range B phase Sl.no
2. MECHANICAL CHECKS AND VISUAL INSPECTION:
ITEM DESCRIPTION CHECKED
1 Inspect for any physical damage or defects.
2 Verify connections as per approved drawings.
3 Check the tightness of all connections.
4 Check ferrules.
5 Check apparatus lists.
6 Check that serial no. of relay matching with serial no. of case.
3. ELECTRICAL TESTS:
3.1 PRELIMINARY TEST:
FUNCTION R Y B
Test Switch Isolation Checked
CT Bus Shorting Contacts Checked
3.2 RELAY BURDEN:
Relay DC voltage Relay DC current Burden
Condition
R Y B R Y B R Y B
No operation
Operation
Note: For 48/54 V burden operation/no operation = 1.3/4.86W
For 110/125V burden operation/ no operation = 3.0 / 4.37W.
Test performed by Test witnessed by Date of test
AREVA T&D
Name MUSTAFA HAJI
Signature
Customer Contract
Location #
Project
Contractor
AREVA T&D Site test record RELAY TEST Doc. Ref.
MVTP11- CT SUPERVISION RELAY
3.3 PICKUP TEST;
Voltage R Y B
Setting Pick up Drop off DO/PU Pick up Drop off DO/PU Pick up Drop off DO/PU
(V) (V) (V) Ratio (V) (V) Ratio (V) (V) Ratio
2
9
Note: Pickup voltage +/-5% Vs. Drop off/ Pickup ratio >85% after 3 sec delay.
3.4 TIMING TEST:
Phase Contacts No. Actual Operating time at 2xVs Expected operating time (s)
R 3 +/-5%
Y 3 +/-5%
B 3 +/-5%
3.5 FINAL SETTING:
Relay final current setting:
3.5.1 PICKUP TEST:
Voltage R Y B
Setting Pick up Drop off DO/PU Pick up Drop off DO/PU Pick up Drop off DO/PU
(v) (V) (V) Ratio (V) (V) Ratio (V) (V) Ratio
4. FUNCTIONAL TEST:
Item Description Checked
1 All contacts checked.
2 All output contacts resistance measured.
3 Flag operation checked.
Test performed by Test witnessed by Date of test
AREVA T&D
Name MUSTAFA HAJI
Signature