Thanks to visit codestin.com
Credit goes to www.scribd.com

0% found this document useful (0 votes)
78 views1 page

N/a N/a 32 P N/a N/a

The landing gear pulleys on an Air Algerie Boeing 737-800 were twisted due to impact from a large bird during landing in Tunis. The pulleys were reinstalled according to the aircraft maintenance manual and tested with no issues found. The work was performed and workorder closed in Algiers with total aircraft hours and cycles recorded.

Uploaded by

Bourradou
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views1 page

N/a N/a 32 P N/a N/a

The landing gear pulleys on an Air Algerie Boeing 737-800 were twisted due to impact from a large bird during landing in Tunis. The pulleys were reinstalled according to the aircraft maintenance manual and tested with no issues found. The work was performed and workorder closed in Algiers with total aircraft hours and cycles recorded.

Uploaded by

Bourradou
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

AIR ALGÉRIE W/O Barcode Registration

AIR ALGERIE TECHNICS AEROPORT


BOUMEDIENNE DAR EL BEIDA ALGIE 12142329 7T-VJL
16100 ALGERIA
Algérien Copy WO12142329 B737 800 -8D6
Type Origin ATA Position Zone Area

P N/A 32 N/A N/A N/A


PIREP LANDING GEAR
Classifications/Statistics/Requests

Line/Heavy: LINE MAINTENANCE


Type Reference Description

Flight AH6101 / ATL70336 Arr. Date: 07.Feb.2024 16:00, Dep. Airport: ORN, Arr. Airport: ALG

Description Step 1 MOURAD AMOURA (23590), 07.Feb.2024

POULIES DU CABLE D`ORENTATION DE LA ROULETTE AVANT TORDUES DU A UN IMPACT D`UN GROS OISEAU EN FINALE A TLS
Action Step 1-1 MOURAD AMOURA (23590), 07.Feb.2024

REINSTALLE POULIE SELON AMM 32-51-31-420-005 PARTIE 10 G ET H REV 82 + INSPECTION CHECK IAW
AMM 32-51-31/601 REV 82 . TEST RAS
APRS AH 158
Performed

MOURAD AMOURA (23590)

Work Performed Workorder Closed


Date Total Aircraft Hours Total Aircraft Cycles Place / Station Closing Sign / Stamp

08.Feb.2024 02:00 54567:48 33436 ALG


MOURAD AMOURA (23590)

Compliance text to be defined

Commercial Information

Customer:
Project Number:

(Page 1 / 1)
COPY printed by 36258 on Thu. 15.February 2024 at 09:41 out of database prod hosted on 10.0.103.10 produced by AMOS www.swiss-as.com

You might also like