Milestones

List view

  • Software/system/configuration changes that are needed to cleanup system operations.

    No due date
    24/29 issues closed
  • Issues that cannot be addressed until an external org (such as Wasabi or SDSC) implements a change

    No due date
    0/1 issues closed
  • Migrate Merritt microservices to container deployment. **Not currently in scope**

    No due date
    2/2 issues closed
  • General Merritt data management/versioning practices

    No due date
    3/5 issues closed
  • Develop tools to make it easier for campus depositors to automate submission preparation and manifest creation. Report potential errors as early in the process as possible.

    No due date
    2/2 issues closed
  • Format identification and characterization

    No due date
    1/1 issues closed
  • Create proper Merritt API that has been extracted from the Merritt UI. Replace Sword and OAI functionality with a more modern API setup. Possibly introduce API key authentication versus LDAP.

    No due date
    6/15 issues closed
  • Compute metrics about Merritt usage (content ingest, content requests, user info) and track key events

    No due date
    3/3 issues closed
  • Service patching (such as MySQL), Interpreter patching (Rails 5, Java 11), 3rd party dependency patching

    No due date
    6/7 issues closed
  • Tickets that are likely to have already been closed or have been replaced by newer issues.

    No due date
    11/12 issues closed
  • General auto scaling efforts across Merritt services. Migrate to AWS load balancers which would allow programmatic add/removal of servers from a load balancer. Eliminate the Apache load balancer use within Merritt which can introduce human error when managing target servers.

    No due date
    7/7 issues closed
  • Issues with specific production data that require cleanup. Ideally issues placed in this milestone do not have other software dependencies required in order to resolve the issue.

    No due date
    20/29 issues closed
  • Production ETD issues and ETD Process refactoring

    No due date
    17/21 issues closed
  • Placeholder for documentation and system changes to promote transparency. Note that `Collection Admin` items are being organized under a separate milestone.

    No due date
    11/16 issues closed
  • Ideas for a UC3 system inventory. **Ashley will be driving this initiative**

    No due date
    3/5 issues closed
  • Preparation of new collections. Preparation of content for ingest into Merritt. Proactive QA of content before ingest.

    No due date
    53/59 issues closed
  • Merritt documentation. Generate reports for Merritt depositors

    No due date
    13/15 issues closed
  • Improve the throughput of content in Merritt ingest. Auto scale ingest processing to meet demands of Merritt depositors.

    No due date
    20/20 issues closed
  • Improve processes to detect system health and to improve the reliability of system alerts

    No due date
    5/9 issues closed
  • Ensure throughput of content through the Audit/Replic/Storage services. Manage processing of large objects to prevent collisions and server resource errors. Ensure all content is audited in a 60-90 day window.

    No due date
    38/39 issues closed
  • Improvements to the software build process and other general code refactor efforts

    No due date
    21/24 issues closed
  • Automation of end to end tests of system components (including specific external cloud providers). Improve the ability to test system components from the docker stack.

    No due date
    9/12 issues closed
  • Refactor system configurations to use SSM parameters

    No due date
    7/8 issues closed