Thanks to visit codestin.com
Credit goes to github.com

Skip to content

2025-08-01 Process & Tools Enable Development

Open
Overdue by 3 month(s)
Due by August 1, 2025
Last updated Oct 30, 2025
63% complete

Left side of V-Model done.

Acceptance Criteria:

  • Process & Tooling for requirements & architecture is available (sphinx-needs incl. additional checks for verifying traceability/consistency).
  • Process & Tooling for Detailed design, implementation & unit verification defined and implemented (e.g. spinx-test-reports).
  • CI/CD is capable to automatically verify the consistency & traceability.
  • Tooling for test coverage & static code analysis.

Prerequisites:
Selection of tooling (e.g. static code analysis).

List view