Thanks to visit codestin.com
Credit goes to github.com

Skip to content

Fixing Docker build for goreleaser. #1559

Fixing Docker build for goreleaser.

Fixing Docker build for goreleaser. #1559

Triggered via pull request September 23, 2025 19:51
Status Cancelled
Total duration 1m 19s
Artifacts

go.yml

on: pull_request
Matrix: integration_tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
integration_tests (12.0.0-ubuntu, 0, 1.25.1)
The operation was canceled.
integration_tests (12.0.0-ubuntu, 0, 1.25.1)
The run was canceled by @safaci2000.
integration_tests (11.6.0-ubuntu, 1, 1.25.1)
The operation was canceled.
integration_tests (11.6.0-ubuntu, 1, 1.25.1)
The run was canceled by @safaci2000.
integration_tests (12.0.0-ubuntu, 1, 1.25.1)
The operation was canceled.
integration_tests (12.0.0-ubuntu, 1, 1.25.1)
The run was canceled by @safaci2000.
Go
The run was canceled by @safaci2000.
integration_tests (11.6.0-ubuntu, 0, 1.25.1)
The operation was canceled.
integration_tests (11.6.0-ubuntu, 0, 1.25.1)
The run was canceled by @safaci2000.