Thanks to visit codestin.com
Credit goes to github.com

Skip to content

ICS feed integration is slow to show the calendarΒ #28192

@afreydev

Description

@afreydev

Found a bug? Please fill out the sections below. πŸ‘

Issue Summary

In my company, we have a self-hosted instance of cal.com. But
The server is taking 20+ seconds to sync with an ICS feed.

Steps to Reproduce

  1. Went to https://cal.mydomain.co/myuser/meeting?user=myuser&duration=25&overlayCalendar=true

It's super slow to show the calendar. The question is: Is this a normal behaviour? Or it is maybe a bug.
Or it can be related to some configuration items.

Actual Results

  • Slow answer from the server.

Expected Results

  • Maybe some improvements in the performance.

Technical details

  • We are using the v6.2.0 version on the server.
  • Docker compose to deploy.

Evidence

The test is basically to open the calendar url and we can see this behaviour.

Image

During a test, we can see it's using a complete cpu in the process.

Image

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions