Acceptance Test Procedure (ATP)

Audience: the contract manufacturer's test technician, the depot's intake QA officer, and any independent verifier.

Purpose: to determine whether a single NULLWEAR/P unit, fresh from manufacture or after refurbishment, is fit for issue.

This is the bench-level test. It is necessary but not sufficient — every unit must also pass 10-field-testing-protocol.md before issue to officers.


Equipment per test bench

  • One DUT (device under test).
  • One reference test source (ESP32 emulator, MAC 00:25:DF:DE:AD:BE, fixed location 1 m from the DUT).
  • One reference receiver (Linux laptop running ref_receiver.py, fixed location 1 m on the other side of the DUT, line-of-sight).
  • One bench USB-C power supply capable of 5 V / 1 A.
  • One digital multimeter (for charge-current measurements).
  • One bench J-Link (for firmware version verification).
  • One computer running the ATP test harness (a Python script that orchestrates the receiver and emits a pass/fail report).
  • A shielded RF enclosure is recommended but not required; a quiet RF environment (no Wi-Fi closer than 5 m) is sufficient.

Test sequence

The full ATP takes approximately 8 minutes per unit, of which most time is automated.

Test 1 — Visual inspection

Check Pass criterion
Enclosure intact, no cracks, no weld seam gaps Pass / Fail
LED light pipe flush with enclosure Pass / Fail
USB-C port clean, no debris, no bent pins Pass / Fail
Belt clip / mounting holes M3-thread present Pass / Fail
Serial number laser-etched legibly Pass / Fail

Test 2 — Power-on self-test

Connect to USB. Within 2 seconds, the LED must illuminate. Within 5 seconds, the firmware must complete boot. Connect via J-Link RTT and verify:

  • Boot banner present, firmware revision matches expected.
  • nullwear_app: Net-core IPC bound log present.
  • nullwear_net: Starting radio jammer log present.
  • No ERROR-level log lines.

Pass / Fail.

Test 3 — Battery system

Measurement Pass criterion
VBAT at startup (read via fuel gauge) ≥ 3.7 V
Reported state-of-charge ≥ 65%
MAX17048 detected and version-read OK Pass
Charger STAT pin reads "charging" when USB connected Pass
Quiescent current with USB disconnected and radio idle ≤ 100 µA

Test 4 — RF receiver sensitivity

DUT placed at 5 m from the test source, line-of-sight. Test source confirmed to be broadcasting (run ref_receiver.py --duration 30 from 1 m before placing the DUT, expect ~900 packets).

Power off the test source. Wait 5 seconds for receiver bleed-off.

Power on the test source.

Run on the receiver:

python ref_receiver.py --duration 60 --baseline-target-rx 1500 --out-json atp_test4.json

Expected: with a working DUT in the path, target_packets_received ≤ 15. PAR ≥ 0.99.

Pass / Fail.

Test 5 — Selective isolation

While the test source remains active, also activate two non-target BLE devices in the test area:

  • A smartphone with Bluetooth on, advertising as a generic device.
  • A second ESP32 emulator broadcasting MAC 02:00:00:00:00:01 (a non-Axon OUI).

Run a second receiver scan:

python ref_receiver.py --duration 60 --out-json atp_test5.json

Verify:

  • Target packets (00:25:DF:DE:AD:BE): ≤ 15 (still being annihilated).
  • Non-target packets: in line with their normal advertising rates (~tens to hundreds per device per minute).

Failure mode: if non-target packets are also being suppressed, the OUI matcher is malfunctioning. RMA the unit.

Pass / Fail.

Test 6 — Charge cycle

Connect DUT to bench USB-C supply. Confirm:

Measurement Pass criterion
Charge current at start (battery low) 400–500 mA
Charge current at 90% SoC 80–150 mA
Charge current at 100% SoC (sustained) ≤ 1 mA (trickle / cutoff)
Time from < 5% to 100% ≤ 70 minutes
No abnormal heating (case > 45 °C) at any point Pass

Test 7 — Sleep current

Disconnect USB. Place unit in deep-sleep mode (long-press button 3 seconds; net core should remain awake; app core enters STOP mode).

Measure DUT current draw with multimeter in series with battery.

State Pass criterion
Deep sleep (radio off) ≤ 5 µA
Idle (radio scanning, no traffic) ≤ 4 mA

Test 8 — Mechanical (sample-rate)

Sample 1% of every batch:

Test Method Pass criterion
IP67 immersion 1 m water, 30 min, then re-run Tests 2–4 All pass
Drop test 1.5 m onto concrete, 6 faces No cosmetic damage > 1 mm; functional pass
Temperature –10 °C and +55 °C operation Functional pass

Test 9 — Firmware integrity

Connect to USB-CDC. Issue command version. Verify response matches expected build SHA256 hash.

For signed images, verify the MCUboot signature is valid by attempting to flash an unsigned test image — the bootloader must reject it.

Pass / Fail.

Test 10 — Final visual + serial registration

Re-inspect after testing. Record serial number, firmware version, all test results, and pass/fail verdict in the asset system.


Automated test harness

A Python script (tools/atp/run_atp.py) automates Tests 2–7 and emits a JSON report. To be supplied by the contract manufacturer's test rig integration:

result = atp.run_full(dut_serial="NW-P-2026-00001",
                     bench_id="ATP-BENCH-3")
assert result.verdict == "PASS"
print(result.summary)

The Python script:

  1. Connects to the bench fixtures (programmable USB power, current meter, J-Link, RTT).
  2. Programs the DUT with the production firmware image.
  3. Runs each test in sequence.
  4. Captures all measurements.
  5. Emits a signed PASS/FAIL report.

Acceptance threshold

A unit passes ATP only if all Tests 1–7, 9, 10 are individually pass, and the unit is in a sample that has met the sample-rate criteria for Test 8.

Reject rate budgeting: with mature manufacturing, the expected reject rate at ATP is ≤ 1%. Higher rates indicate a manufacturing process drift; investigate.


Reporting

Per-unit ATP reports must be retained for the operational lifetime of the unit plus 7 years (i.e. typically ~14 years total). They form part of the agency asset record.

Aggregate ATP statistics (reject rate, common reject causes) should be reported monthly by the contract manufacturer to the agency procurement officer.

Cross-reference: 09-operations-manual.md §1 — Receipt and intake.