Server #89
server-tests.yml
on: schedule
Types
/
Check
1m 18s
Matrix: Tests / Integration
Coverage Wrap Up
0s
Matrix: Downstream
Annotations
7 errors
|
Migration / Migrate
Process completed with exit code 128.
|
|
Migration / Success
Process completed with exit code 1.
|
|
Tests / Integration (mariadb, 1)
The job has exceeded the maximum execution time of 30m0s
|
|
Tests / Integration (mariadb, 1)
The operation was canceled.
|
|
Tests / Integration (mariadb, 2)
The job has exceeded the maximum execution time of 30m0s
|
|
Tests / Integration (mariadb, 2)
The operation was canceled.
|
|
Tests / Success
Process completed with exit code 1.
|