-
Notifications
You must be signed in to change notification settings - Fork 35
Open
Labels
3-tac-meeting-longTopic for TAC meeting needing 30 minutesTopic for TAC meeting needing 30 minutes
Description
Please share any additional details on this topic
Hearing from the mentors of the 2025 program, there are several points of feedback:
- Lack of system availability makes it challenging for mentees
- North American student interest is quite low
- Being a mentor is a lot of work, and it's hard to prioritize for a project
Detail what actions or feedback you would like from the TAC
Discuss with the TAC and see if there are things that can be done to address
How much time do you need for this topic?
20 minutes
Metadata
Metadata
Assignees
Labels
3-tac-meeting-longTopic for TAC meeting needing 30 minutesTopic for TAC meeting needing 30 minutes
Type
Projects
Status
On Hold