Thanks to visit codestin.com
Credit goes to github.com

Skip to content

CRUX Phase 3: 81 missing stories across 8 M-groups (umbrella) #917

@noahgift

Description

@noahgift

Umbrella epic for CRUX Phase 3

The CRUX spec (docs/specifications/crux-competitive-research-ux-workflows.md) benchmarks aprender against every major ML/AI competitor by converting competitor verbs into 250 provable contracts (contracts/crux-*-v1.yaml).

Phase 1 (100% spec coverage) landed in PR #916 @ 960f7d5c3 — all 250 contracts authored + dogfooded through pv validate / pv lint / pmat comply check.

Phase 3 = implement the 81 stories currently marked missing. This epic tracks the 8 child M-group epics.

Children

Exit criteria

  • All 81 contracts promoted from missingsupported
  • apr qa --crux reports 250/250 PASS
  • Master contract status block supported_count reaches 250

References

Metadata

Metadata

Assignees

No one assigned

    Labels

    cruxCRUX competitive-research-UX specepicEpic — multi-story umbrellaphase-3CRUX phase_3_missing — implement new stories

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions