Thanks to visit codestin.com
Credit goes to www.scribd.com

100% found this document useful (1 vote)
8K views4 pages

Started On State Completed On Time Taken Marks Grade Feedback

The document summarizes the results of a post-quiz attempt on configuration management and version control. It shows that the quiz was completed on October 31, 2022 at 10:55 PM and the student received a score of 7 out of 8 (87.5%). The summary includes the student's responses to 8 multiple choice questions, indicating whether each answer was correct or incorrect. It provides feedback for incorrect answers.

Uploaded by

Harsh Bhoyar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
8K views4 pages

Started On State Completed On Time Taken Marks Grade Feedback

The document summarizes the results of a post-quiz attempt on configuration management and version control. It shows that the quiz was completed on October 31, 2022 at 10:55 PM and the student received a score of 7 out of 8 (87.5%). The summary includes the student's responses to 8 multiple choice questions, indicating whether each answer was correct or incorrect. It provides feedback for incorrect answers.

Uploaded by

Harsh Bhoyar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

10/31/22, 10:56 PM Post-Quiz: Attempt review


Dashboard / Software Engineering_TE / Configuration Management And Version Control / Post-Quiz

Started on Monday, 31 October 2022, 10:44 PM


State Finished
Completed on Monday, 31 October 2022, 10:55 PM
Time taken 11 mins 4 secs
Marks 7.00/8.00
Grade 87.50 out of 100.00
Feedback Congratulations!! You have passed by securing more than 80%

Question 1
Correct

Mark 1.00 out of 1.00

110161
Preventive   Corrective   Adaptive   Perfective  

John bought a new Laptop with a high end configuration. To protect his laptop and the applications installed he installed a antivirus
software.This is an example for Preventive    Maintenance

Question 2
Correct

Mark 1.00 out of 1.00

Match the correct option

110161
The standard document where the requester fills the change in the change management Change Request Form
process

Process that ensures different versions of the project is managed


Configuration Management

Process that ensures that changes made are recorded and controlled
Change Management

Who authenticates that the change proposed is valid


Change Control Board

110161
Your answer is correct.

The correct answer is: The standard document where the requester fills the change in the change management process → Change Request
Form, Process that ensures different versions of the project is managed → Configuration Management, Process that ensures that changes
made are recorded and controlled → Change Management, Who authenticates that the change proposed is valid → Change Control Board

https://accenturelearning.tekstac.com/mod/quiz/review.php?attempt=2074603&cmid=856#question-2075377-2 1/4
10/31/22, 10:56 PM Post-Quiz: Attempt review

Question 3
Correct

Mark 1.00 out of 1.00

Version Management allows parallel concurrent development. State True or False.

Select one:
a. True
b. False

The correct answer is: True

Question 4
Correct

Mark 1.00 out of 1.00

110161
From the options identify the features that are part of the software configuration management

Select one or more:


a. Concurrency control

b. Support management

c. Synchronisation control

d. Version management

Your answer is correct.

110161
Version Management, Synchronization Control and Concurrency Control are the features that are part of the software configuration
management

The correct answers are: Version management, Concurrency control, Synchronisation control

Question 5
Incorrect

Mark 0.00 out of 1.00

version   artifact   baseline   SRS  

110161
The entry door of the Server room inside the company can be considered as equivalent to
configuration management.

version  [baseline] concept in

Your answer is incorrect.

https://accenturelearning.tekstac.com/mod/quiz/review.php?attempt=2074603&cmid=856#question-2075377-2 2/4
10/31/22, 10:56 PM Post-Quiz: Attempt review

Question 6
Correct

Mark 1.00 out of 1.00

_________ is a committee that makes decisions regarding whether or not proposed changes to a software project can be incorporated.

Select one:
a. Decision Committee
b. Updation Control Board
c. Modify Control Board
d. Change Control Board

The correct answer is: Change Control Board

Question 7
Correct

Mark 1.00 out of 1.00


110161
State true or false. Automated tools are available in the market, for managing change and versioning the software

Select one:
a. TRUE

b. FALSE

Your answer is correct.

The correct answer is: TRUE

110161
Question 8
Correct

Mark 1.00 out of 1.00

Which of the following describes the change history of an object?

Select one:
a. Check-out
b. Baseline
c. Evolution graph
d. Review Graph 110161
Evolution Graph describes the change history of an object
The correct answer is: Evolution graph

◄ Test Your Understanding (copy)

Jump to...

Additional Links For Reference ►

https://accenturelearning.tekstac.com/mod/quiz/review.php?attempt=2074603&cmid=856#question-2075377-2 3/4
10/31/22, 10:56 PM Post-Quiz: Attempt review

110161

110161

110161

https://accenturelearning.tekstac.com/mod/quiz/review.php?attempt=2074603&cmid=856#question-2075377-2 4/4