Merge pull request #1427 from uuf6429/fix/improve-test-system #304
build.yml
on: push
Matrix: Build and test
Static analysis
25s
Publish the PHAR for release
0s
Annotations
4 warnings
|
Build and test (8.2, ubuntu-latest, update, 7.0)
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/11bd71901bbe5b1630ceea73d27597364c9af683'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
|
Build and test (8.2, ubuntu-latest, update, 7.0)
Back off 18.923 seconds before retry.
|
|
Build and test (8.2, ubuntu-latest, update, 7.0)
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/11bd71901bbe5b1630ceea73d27597364c9af683'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
|
Build and test (8.2, ubuntu-latest, update, 7.0)
Back off 14.695 seconds before retry.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
behat.phar
Expired
|
602 KB |
sha256:dcdbf6eca88de296905a604c0777d2b40035b493ab11c39822d9b83f5c22aee3
|
|