Thanks to visit codestin.com
Credit goes to github.com

Skip to content

changjurhee/AONE

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

AONE

  • 2023 LG SA
  • VoIP System

ground rule

  • 10:00 am meeting w/ mentor

Project Deliverables

  • There are three milestones required for this project (each of which will be graded independently):
    • Requirements, plan and risks: For the first milestone the team will turn in the prioritized architectural drivers, any draft design decisions they are considering, the technical risks identified, and the experimentation plans (or any results already achieved).
    • Experimentation results, design, plan for construction: The team will turn in the results of experiments conducted, a design description with different architecture views, and the plan for construction.
    • Demo and lessons learned: For the final milestone, the team will demo the completed system, and present the lessons learned.

Packages

No packages published

Contributors 7