Thanks to visit codestin.com
Credit goes to github.com

Skip to content

Conversation

marc-gr
Copy link
Contributor

@marc-gr marc-gr commented May 27, 2021

What does this PR do?

Move remaining edge processing to the ingest pipeline and make event.original optional.

Checklist

  • I have reviewed tips for building integrations and this pull request is aligned with them.
  • I have verified that all data streams collect metrics or logs.
  • I have added an entry to my package's changelog.yml file.
    - [ ] If I'm introducing a new feature, I have modified the Kibana version constraint in my package's manifest.yml file to point to the latest Elastic stack release (e.g. ^7.13.0).

Related issues

Screenshots

image
image

@elasticmachine
Copy link

Pinging @elastic/security-external-integrations (Team:Security-External Integrations)

@elasticmachine
Copy link

elasticmachine commented May 27, 2021

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: Pull request #1025 updated

  • Start Time: 2021-05-27T12:56:09.368+0000

  • Duration: 20 min 53 sec

  • Commit: de8a69a

Test stats 🧪

Test Results
Failed 0
Passed 43
Skipped 0
Total 43

Trends 🧪

Image of Build Times

Image of Tests

Copy link
Member

@P1llus P1llus left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM, would be nice if you could bump the ECS version as well?

@marc-gr marc-gr merged commit 41fc0ba into elastic:master May 27, 2021
@marc-gr marc-gr deleted the apache-changes branch May 27, 2021 13:17
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
enhancement New feature or request Integration:apache Apache HTTP Server
Projects
None yet
Development

Successfully merging this pull request may close these issues.

3 participants