Thanks to visit codestin.com
Credit goes to github.com

Skip to content

Conversation

endorama
Copy link
Member

What does this PR do?

Checklist

  • I have reviewed tips for building integrations and this pull request is aligned with them.
  • I have verified that all data streams collect metrics or logs.
  • I have added an entry to my package's changelog.yml file.
  • If I'm introducing a new feature, I have modified the Kibana version constraint in my package's manifest.yml file to point to the latest Elastic stack release (e.g. ^7.13.0).

Author's Checklist

  • [ ]

How to test this PR locally

Related issues

Screenshots

@elasticmachine
Copy link

elasticmachine commented Nov 17, 2021

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview preview

Expand to view the summary

Build stats

  • Start Time: 2021-11-17T16:23:32.697+0000

  • Duration: 38 min 53 sec

  • Commit: d9ffec3

Test stats 🧪

Test Results
Failed 0
Passed 73
Skipped 0
Total 73

🤖 GitHub comments

To re-run your PR in the CI, just comment with:

  • /test : Re-trigger the build.

@endorama endorama merged commit bfe2720 into elastic:master Nov 25, 2021
@endorama endorama deleted the release-8/mysql branch November 25, 2021 15:51
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

3 participants