Thanks to visit codestin.com
Credit goes to github.com

Skip to content

Conversation

@ryzhyk
Copy link
Contributor

@ryzhyk ryzhyk commented Jan 23, 2026

Semantically, delete actions in a delta lake log entry are applied before insert actions; however the delta spec doesn't guarantee that actions occur in any particular order.

This commit makes sure that delete actions are processed before inserts.

Semantically, delete actions in a delta lake log entry are applied before
insert actions; however the delta spec doesn't guarantee that actions occur in
any particular order.

This commit makes sure that delete actions are processed before inserts.

Signed-off-by: Leonid Ryzhyk <[email protected]>
@ryzhyk ryzhyk requested a review from swanandx January 23, 2026 05:16
@ryzhyk ryzhyk added the connectors Issues related to the adapters/connectors crate label Jan 23, 2026
Copilot AI review requested due to automatic review settings January 23, 2026 05:16
Copy link
Contributor

Copilot AI left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Pull request overview

This PR ensures correct ordering of Delta Lake transaction log actions by processing delete operations before insert operations. While the Delta Lake specification defines that deletes semantically precede inserts, it doesn't guarantee action ordering in the log files.

Changes:

  • Separated action processing into two passes: first handling Remove actions, then Add actions
  • Added explanatory comments documenting the semantic ordering requirement from the Delta Lake specification

Comment on lines +1693 to +1694
for action in actions {
if matches!(action, Action::Add(_)) {
Copy link

Copilot AI Jan 23, 2026

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

The actions collection is iterated twice (once for Remove, once for Add). Consider using partition or a single-pass approach with separate collections to avoid the second full iteration over all actions.

Copilot uses AI. Check for mistakes.
@ryzhyk ryzhyk added this pull request to the merge queue Jan 23, 2026
@github-merge-queue github-merge-queue bot removed this pull request from the merge queue due to failed status checks Jan 23, 2026
@ryzhyk ryzhyk added this pull request to the merge queue Jan 24, 2026
@github-merge-queue github-merge-queue bot removed this pull request from the merge queue due to failed status checks Jan 24, 2026
@ryzhyk ryzhyk added this pull request to the merge queue Jan 24, 2026
Merged via the queue into main with commit 567cfd0 Jan 24, 2026
6 of 7 checks passed
@ryzhyk ryzhyk deleted the delta-delete-before-insert branch January 24, 2026 19:36
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

connectors Issues related to the adapters/connectors crate

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants